KMF Traffic Group, LLC

www.kmftraffic.net

Stuart, Florida 34997

Voice (772) 221-7971 - Cell (772)924-6993 - email kmf@kmftraffic.net

Mario Fiorillo

Senior Project Manager

 

Mario Fiorillo has over 35 years of diverse experience in the areas of Traffic Engineering, Signal Design, Traffic Operations and Traffic Data Collection, with particular skills in the detailed analysis of traffic operations. He has been involved in the design of both isolated and network signal projects and has directed a number of Traffic Impact and Parking Studies, Signal Warrant, developed conceptual, preliminary and final Traffic Signal Plans, Signing, Striping and Maintenance of Protection of Traffic “Work Zone” for a wide variety of private developers and public agencies.  His experience includes the use of numerous Transportation software such as PASSER, TRANSYT7F, TRAF-NETSIM, SYNCHRO plus SimTRAFFIC, CORSIM, SOAP, CINEMA, HCS, and others. Mr. Fiorillo has developed numerous Civil and Transportation Engineering software, for use in-house and in the field.  He has also developed numerous project and companies web site.

 

EDUCATION

Bachelor of Architecture, Atlantic University, 1972

Northwestern University, Evanston, Illinois, 1979

Computer Processing Institute, Bridgeport, Connecticut

Polytechnic Institute of New York

Georgia Institute of Technology

International Municipal Signal Association

PROJECT EXPERIENCE

KMF has conducted over 500 plus manual traffic surveys and ATR (Volume, Classification, Speed, and Gap studies for traffic engineering firms in Florida. All of these studies have been completed and delivered in a timely fashion

With KMF Traffic Group

Fort Lauderdale by the Sea, FL

Vehicle/Pedestrian conflict. Collect and video intersection of A1A and Commercial Blvd. for two days (weekday and weekend), for illegal pedestrian crossing, vehicles over run stop bar and near collision between vehicles/pedestrian.

Orange Brook Elementary School, Hollywood, FL

Performed queue study at the school during the AM and mid-afternoon.

Cove Shopping Center, Deerfield Beach, Fl.

Performed parking accumulation study and determined number of illegal vehicles park in the site and have other destination such as the beach.

Midway Road and I-95, Port Saint Lucie, Fl.

Performed manual count at Midway Road and ON and OFF ramps during the AM and PM. Set up automatic traffic recorders east and west if I-95 on Midway Rd., and a third counter Glades Cut-Off Rd west of Delcris Dr.

Kennel Parking Study in Palm Beach, Daytona Beach and Jacksonville, FL.

Performed a week parking study at the three facilities by setting up ATR’s at all of the driveways to the facility.

S17th St and Okeechobee Rd., Fort Pierce, FL

Performed manual traffic count between 7-9AM and 4-6PM.

Key West, FL.

Collected ADT bi-directional traffic volume and speed data at 13 locations on three different month of the year and collected turning movement data at 24 major intersections including a) Tour Trains, b) General Tour Vehicles (trolleys, Ghost Tour, etc.), c) Delivery Trucks/Buses (City Buses and large passenger Buses), d) Bikes, e) Pedi-cabs (Three-wheeled bikes), f) Mopeds and Scooters, g) Electric

Cars/Golf Carts, and h) Passenger Cars/Trucks.

Hallandale, FL.

Collected turning movement data and existing lane configuration at 6 major intersections and videotaped the network of streets within the study area.

Stirling, NJ.

Three days parking accumulation study. Prepared parking layout drawing.

Hollywood, FL.

Collected ADT bi-directional traffic volume data at 5 locations and collected turning movement data at 7 major intersections within the vicinity.

Wellington, FL.

Collected ADT bi-directional traffic volume and speed at 26 locations for a period of three consecutive days.

Queuing Analysis – Stacking, Boynton Beach, East and West Boca, FL.

Collected maximum queue at 3 teller lanes every 5 minutes for 8 hours at three different Bank branch offices for two days each.

Trip Generation Study

Collected Automatic Traffic Recorder bi-directional volume at four different hotels in Jacksonville, Orlando, Ocala and Lakeland for one week each and others

With Traffic Engineering Companies

City of Homestead Traffic Consultant, Homestead, Florida.

Developed computer software (Excel) to manage the City Concurrency Management System within the City limits. Serve as part of the technical team reviewing traffic studies, and the City concurrency management system roadway network; provide committed development traffic to consultants preparing Traffic Impact Studies within the City limit. Review on behalf of the City the following items: traffic impact studies, traffic modeling, capacity analysis, trip generation, proposed traffic distribution for any new development within the city, internal and external circulation, parking signage, access points location and sight distance, parking requirements based on city ordinance, turning lane requirement, etc.

03W Elementary School (Palm Beach County)

Prepared Traffic Impact Study for a new elementary School in Palm Beach County.

Midway Road Study, from 25th Street to Turnpike St. Lucie, Florida.

Prepared Traffic Signal Plans for three intersections (Jenkins Rd., Selvitz Rd., and 25TH Street) along Midway Road (CR 712). Duties included existing signal inventory and Synchro analysis of this corridor between FTPK overpass and 25TH Street. During this analysis storage length from the main road into unsignalized intersections were estimated and design, duties included the inventory of existing conditions, developing phasing, timing, electrical wiring diagram signalization layouts, details etc using Microstation. The signalization Plans included: Key Sheet, Tabulation of Quantities, General notes, Signalization Plan for the above three intersections, Guide Sign Sheet, and Mast Tabulation.

Walton Road - 4 Lanes Improvements City of Port St. Lucie, Florida.

Prepared Signal and Electrical Design for two intersections along Walton Rod. Duties included the inventory and Synchro analysis of this corridor between Village Green Drive and Lennard Road. During this analysis storage length from the main road into unsignalized intersections were estimated and design, duties included the inventory of existing conditions, developing phasing, timing, electrical wiring diagram signalization layouts, details etc using AutoCAD

Old Hammock Road/Isla Verde of Wellington, Wellington, Florida.

Prepared Signalization Plan for main access driveway to this proposed development with State Road 7 (U.S. 441), meet with FDOT and Palm Beach County, duties included the inventory of existing conditions, developed traffic signal phasing, signal timing, electrical wiring diagram layouts, field survey with FPL to obtain future power source, etc.

City of Fort Pierce, Florida.

Developed computer software (Excel) to manage the City Concurrency Management System within the City limits. The proposed new turning movement site traffic for a proposed development is enter on individual spread sheet, this site traffic is added to the existing traffic plus background growth.  Capacity of the links or the sum of NB (EB) and SB (WB) are analyzed during the P.M. Peak Hour. Bi-directional link capacity analysis of the existing Traffic Volumes is performed thru-ought the network. The contributing percentage of each individual approved project to each of the links is also calculated and it will be use for future mitigation. The existing traffic volume can also be updated via spreadsheet. A total of 13 major corridors were developed with 42 nodes and approximately 62 links for this network.

City of Pahokee Florida.

Developed computer software (Excel) to manage the City Concurrency Management System within the City limits. The proposed new turning movement site traffic for a proposed development is enter on individual spread sheet, this site traffic is added to the existing traffic plus background growth.  Capacity of the links or the sum of NB (EB) and SB (WB) are analyzed during the P.M. Peak Hour. Bi-directional link capacity analysis of the existing Traffic Volumes is performed thru-ought the network. The contributing percentage of each individual approved project to each of the links is also calculated and it will be used for future mitigation. The existing traffic volume can also be updated via spreadsheet.

Transportation Planner Consultant to the City of West Palm Beach, Florida.

Transportation Planner to the City of West Palm Beach works at City Hall helping the Planning Department on Traffic and Transportation issues. From preparing and reviewing Traffic Impact Studies, parking layout, internal circulation, provide recommendation to the City Planning Department before current applications are approve.

Tri-Rail Double Track Corridor Improvement Program, South Florida.

Tri-Rail Double Track Corridor Improvement Program, Segment 5 Project that will allow the South Florida Regional Transportation Authority/ Tri-Rail to expand commuter rail service to relieve South Florida’s congested highways while providing improved connectivity. Once completed, the Segment 5 Project will allow SFRTA/Tri-Rail to run trains every 20 minutes during peak hours. This work includes the review of existing safety conditions at 32 major crossing between Palm Beach, Broward and Dade County and the modification and expansion of signal. For this study, existing traffic data and observation of exiting queues at these locations were observed and a simulation of the existing condition was developed using SimTraffic to duplicate the field observation. This file was then modified on the basis of future traffic projections and new train schedules to simulate future condition and analyses possible queues between major intersections and railroad crossings.

Truck Route Management and Community Impact Reduction, New York (NYCDOT).

Sub consultant to Edwards and Kelcey. The goal and objectives of this project include coordinating engineering, educational, informational and enforcement efforts so that trucks remain on designated truck routes until reaching the intersection nearest their destinations, and do not inappropriately utilize residential streets. Performed the following tasks on this project. Review existing traffic volume data: 1) At major street and arterials, 2) Truck route sign inventory, 3) Street geometric at problem locations within the study area, 4) Examine existing truck routes throughout of the five Boroughs in New York and make recommendations to improve safety, efficiency, and promote time savings in truck operation while reducing pollution levels, 5) Identify and examine concerns of truck operators and make recommendations, 6) Examine feasibility, of removing trucks from inappropriate streets and routing to arterial streets and highways suitable for truck traffic, 7) Attend public meetings in all Five Boroughs throughout the life of the project. These meetings provide community members, business groups an additional forum by which they can participate in the project. These meetings served to introduce the project, present the results of our initial community survey, and begin to work with communities on highlighting the issues and concerns affecting their neighborhoods. Developed power point presentations to outline existing problems and provide recommendation to the problems. This presentation included still pictures, links to stream video of the area in question, and graphic representation of possible solutions, this was achieved by superimposing the improvements to still picture of the problem location.

New Paltz Buildings, New Paltz, NY (DEC).

Redesign existing parking lot layout base on a new site configuration and propose grade. Responsible for storm-water management design in conformance with the new guidelines by the DEC Design Manual. Evaluated all the acceptable storm water management practices such as ponds, wetlands, infiltration, filtering systems & channel systems. The following software was used Hydro Cad and TR-55, to perform the Hydrologic Analysis and develop the bio-retention basins for this project.

 

Plus numerous other projects.

Return to main menu